← Development applications near you

Submissions closed DA-356/2026 · Waverley Council

Will the 4-storey DA at 10 Forest Knoll Avenue, Bondi Beach shade your home?

On the shortest day, a window on the building on Forest Knoll Avenue, 5 m south-west, gets 4 h 30 min of direct sun today. With this building next door it would get 45 min.

5nearby buildings lose winter sun
3 h 45 minmost lost at one window on 21 June
3may fail a test councils use

With the massing below, 5 neighbouring buildings (homes, or buildings whose use the map does not record) would lose some direct sun between 9am and 3pm on 21 June, and on 3 of them some walls may fail one of the tests councils use (dropping below 2 hours, or losing more where they already have less).

When the sun goes. The window that loses most on each nearby building, through the shortest day (21 June), in 15-minute steps.
sun it keepssun this building takesin shade already
Building on Forest Knoll Avenue (5 m south-west)4 h 30 min → 45 min
Building on Forest Knoll Avenue (2 m north-east)1 h 45 min → 45 min
Building on Sir Thomas Mitchell Road (15 m east)45 min → 30 min
Building on Forest Knoll Avenue (4 m south-east)5 h 45 min → 2 h 30 min
Building on Forest Knoll Avenue (15 m south-west)6 h → 4 h 45 min
9am1011noon123pm
Where the new shadow falls. Red is shade that is not there today; blue buildings are homes that lose some sun.
Shadow of the proposed building at 9am, noon and 3pm on 21 June

Rough estimate. We do not have this DA's plans yet, so the building is a plain box: 4 storeys × 3.2 m + 1.5 m for the roof (14.3 m tall), filling the site's lots 3 m in from the boundary. The real design will differ (setbacks, a slimmer tower, taller floors or plant on the roof), so treat this as a first look, not an answer for your window.

All 5 buildings that lose sun, and the tests
BuildingOn some wallsMost lost at one spot
Building on Forest Knoll Avenue (5 m south-west)Some walls may drop below 2 hoursup to 3 h 45 min
Building on Forest Knoll Avenue (2 m north-east)Walls already under 2 hours may lose more than 20%up to 1 h
Building on Sir Thomas Mitchell Road (15 m east)Walls already under 2 hours may lose more than 20%up to 15 min
Building on Forest Knoll Avenue (4 m south-east)Loses some sun; the 2-hour tests still heldup to 3 h 15 min
Building on Forest Knoll Avenue (15 m south-west)Loses some sun; the 2-hour tests still heldup to 1 h 15 min

Submissions closed on 15 October 2026. The DA is not decided yet; some councils still read late submissions, so ask the council.

The application

CouncilWaverley Council
DA numberDA-356/2026
Portal numberPAN-675528
Storeys4
New dwellings2
Cost of worksA$3,300,000
TypeErection of a new structure, Dual occupancy (attached)
Lodged21 September 2026
StatusUnder Assessment

From the NSW Planning Portal. Read the plans and the full description on the council's DA tracker or the Planning Portal (PAN-675528).

How this is worked out

Updated 28 November 2026. © OpenStreetMap contributors (ODbL). Terrain © State of New South Wales (Spatial Services), CC BY 4.0. DA details: NSW Planning Portal. Lot boundaries: NSW Spatial Services (DCS), CC BY 4.0.

Terms · Privacy